REQUIREMENTS FOR A DEVELOPMENT PERMIT
In accordance with section 4.2 of the Rural Municipality of Brackley Zoning & Subdivision (Development) Control Bylaws, no person shall:
a) change the Use of a parcel of land or a structure;
b) commence any "Development";
c) construct any Structure on a Property;
d) make exterior Structural Alterations to any Structure;
e) make any water or sewer connection;
f) make any underground installation such as a septic tank, a fuel tank, a foundation wall or the like;
g) move or demolish any Structure;
h) establish or operate an excavation pit;
i) construct a driveway;
j) place, dump any fill or other material;
k) Subdivide or consolidate a Parcel or Parcels of land;
l) construct a Fence over six (6) feet (1.83 m) to a maximum of ten (10) feet (3.05m) high;
m) place an outdoor Swimming Pool;
n) construct a Deck
without first applying for and receiving a permit from the Municipality.
DEVELOPMENT PERMIT APPLICATION PROCESS
Complete, or have your building contractor complete on your behalf, the Rural Municipality of Brackley’s Development Permit Application Form linked below:
Applications may be submitted to cao@brackleypei.ca for review. Once a complete application is received, the CAO will follow up regarding payment, see fee schedule. Typically, permits are processed within 4 weeks of receiving payment.
ADDITIONAL STEPS
If the structure you are erecting requires a new or expanded septic system, you will require an On-site Sewage Disposal System Permit. The province provides a list of on-site sewage disposal system contractors located here.
If you require an entrance way permit for your property you must apply with the Department of Transportation using the form located here.
If you require the installation or replacement of a culvert you must contact the Traffic Operations Manager for your area.
If your new structure requires a civic address you may apply for one through the province’s Public Safety Division located here.